Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Organiser(s) | Housing & Development Board (HDB) |
Industry Type(s) |
Infrastructure, Urban Solutions
|
Opportunities and Support | Successful applicants can enjoy funding support, mentorship, testbed opportunities, industry showcase |
Application Start Date | 27 September 2022 |
Application End Date | 1 March 2023 |
Website | Click here to learn more |
About Challenge
The construction sector is traditionally reliant on manpower. Though the COVID-19 pandemic highlighted the vulnerability of a labour-intensive industry, it has provided new opportunities to accelerate HDB's productivity drive in the Built Environment (BE) sector.
Learn More
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
a) To Automate Reinforcement Assembly Processes
- Place and secure side forms
- Retrieve main and side meshes from storage to place in mould pallet
- Secure side meshes to main mesh, place and secure spacers, lifting hooks, cut mesh and place box-outs
- Remove side forms (demould)
b) To Automate Concreting Processes
- Spread wet concrete
- Roughen concrete surface
- Solution developed shall be customized to implement in APPS at CBR
- Redesign existing processes and fixtures (e.g. spacer, lifting hooks) suitable for automation production
- Solution must be cost-efficient, scalable (e.g. to produce wall and column), increase construction productivity and safety
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
Moulds are customised according to dimensions required to cast volumetric components such as Prefabricated Bathroom Units (PBU) and Household Shelters (HS).
As a result, many types of moulds would have to be fabricated to produce each different type of PBU and HS. These moulds are costly, take time to fabricate and are usually not reused.
What We Are Looking For- Mould design that can be automatically and mechanically configured in 50mm increments to produce different dimensions of PBUs and HS
- Mould should be able to accommodate standard detailing requirements such as openings for windows and doors.
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
Inspection of precast components (2D and volumetric) during pre-concreting and post concreting are carried out manually through visual inspection by the Resident Technical Officers (RTOs).
The inspection process is time consuming and additional manpower and time is required to rectify mistakes identified by the RTOs.
What We Are Looking For- Innovative solution for precast inspection to improve the productivity of the inspection processes by the RTOs
- Improve accuracy and quality of precast production works
- Reduce manpower and time loss due to rectification works
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
Piling work, regardless of concrete or steel, requires surveyors to mark out the location for the piling. It is time consuming and manual, therefore looking for digital solutions to mark out location of the piles to reduce manpower and time spent on the process.
For automated marking, ground-marker robots or smart piling rigs, with preloaded maps of piling locations from As-Built Drawings, could be deployed. For precise automated verification of pile locations, drones with preloaded maps of pile coordinates could be used.
What We Are Looking For- Solution must be able to read pile layout drawings & automatically lay pile markers at the correct coordinates for riggers to bore
-
Accuracy of +- 10 mm
-
Solution should be able to scan the site and digitally record as-built locations of piles and display eccentricities in stipulated drawing presentation format
-
Users should be alerted to installed piles that deviate from their respective designed coordinates by more than the allowable range listed in the stipulated requirements (to be provided)
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Land Transport, Urban Solutions |
Housing & Development Board (HDB)
Manpower is required to transport materials around the construction site, and up floors to unit locations where materials are needed. The task is mundane and repetitive, which makes it unproductive for manpower to do this.
What We Are Looking For- Built for construction terrain navigation
-
Payload: At least 300 kg
-
Semi-autonomous and Follow-Me modes
-
Automated loading and unloading
-
Able to transport materials from ground floor pick-up to desired floor unit drop-off
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
Manpower is required to prepare the area and mortar mixture for application at precast joints. Workers are to ensure that the bedding meets the requirement and ready to receive the upper component.
What We Are Looking For-
Able to place shim plate to the right level before application of bedding mortar
-
Prepare grout mixture as specified in technical specification
-
Apply bedding mortar to desired location
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
Depending on the location, different surfaces will undergo various multiple surface finishes such skimming, painting, tiling, patch-up of recesses and screeding.
Labor performing surface applications like screeding, painting and skimming could have varying surface consistencies. Labor working on prolonged below the waist trades, like screeding, recess patch-up and floor tiling are prone to musculoskeletal back injuries.
What We Are Looking For
-
Thickness and spread consistency in surface application of screeding, painting, skimming and patch-up finishes
-
Precise sequential placement of tiles onto surface finish, followed by uniform compacting
-
Automate work on majority surfaces, with labor performing corner finishes and refinements
Challenge Owner(s) | Housing & Development Board (HDB) |
---|---|
Industry Types(s) | Digital/ICT, Infrastructure, Urban Solutions |
Housing & Development Board (HDB)
Current Process:
-
Too much hoisting activities on site with limited cranes resources
-
Crane hoisting speed varies and dependent on
- Operator's judgement
- Ground guidance
- Environmental conditions
Challenges:
- Limited skilled operators
- Long operation hours and fatigue issues
What We Are Looking For
-
To develop a smart autonomous control system for tower crane, to speed up hoisting efficiency and improve the working environment of the operator
-
The autonomous control system shall be able to directly manipulate existing tower crane system without operator in cabin
-
To work with HDB’s research partners/team to conduct trials and testbed the current developed autonomous smart crane solution in HDB Centre of Building Research
-
To further develop the current smart crane system and enhance the system robustness to be deployed for commercial application in actual construction site
Join us at the upcoming Cool Ideas Enterprise workshop, where we will launch the call for proposals and share the construction productivity challenge statements.
Briefing Date:Sign up for the latest innovation updates
Customise your preferences to receive updates in industries you're interested in.